At the meeting, chaired by President Shavkat Mirziyoyev on November 2, attention was paid to the state of school buildings, their material and technical base.

At the meeting, chaired by President Shavkat Mirziyoyev on November 2, attention was paid to the state of school buildings, their material and technical base.

After the transition of schools to 11-year education, the number of students increased by 1 million. Currently, 138 school branches do not have their own buildings, student enrollment ratio is exceeded in 55 branches.

Construction and repair work envisaged by the investment program should be completed in 35 schools as soon as possible. It is required to deliver to schools more than 5 thousand units of teaching and laboratory equipment in physics, chemistry and biology, 43 thousand sets of educational furniture.

The President noted the need for speedy completion of construction and repair work in schools, equipping them with centralized investment funds.

Instructions were given taking into account the needs of the regions on the transfer of vacant buildings of colleges and lyceums under the jurisdiction of the Ministry of Public Education before the end of this year, as well as on transforming local schools into full-fledged schools by January 1, 2019, providing schools with buses.

English
Chinese
Turkish
Tajik
Kyrgyz
Turkmen
Japanese
Arabic
English
French
Spanish
Русский
German
Ўзбек
Oʻzbek
Қазақ
The President noted the need for speedy completion of construction and repair work in schools

At the meeting, chaired by President Shavkat Mirziyoyev on November 2, attention was paid to the state of school buildings, their material and technical base.

At the meeting, chaired by President Shavkat Mirziyoyev on November 2, attention was paid to the state of school buildings, their material and technical base.

After the transition of schools to 11-year education, the number of students increased by 1 million. Currently, 138 school branches do not have their own buildings, student enrollment ratio is exceeded in 55 branches.

Construction and repair work envisaged by the investment program should be completed in 35 schools as soon as possible. It is required to deliver to schools more than 5 thousand units of teaching and laboratory equipment in physics, chemistry and biology, 43 thousand sets of educational furniture.

The President noted the need for speedy completion of construction and repair work in schools, equipping them with centralized investment funds.

Instructions were given taking into account the needs of the regions on the transfer of vacant buildings of colleges and lyceums under the jurisdiction of the Ministry of Public Education before the end of this year, as well as on transforming local schools into full-fledged schools by January 1, 2019, providing schools with buses.